{"id":62987,"date":"2025-07-14T13:20:20","date_gmt":"2025-07-14T09:20:20","guid":{"rendered":"https:\/\/www.uaebarq.ae\/en\/?p=62987"},"modified":"2025-07-14T13:20:22","modified_gmt":"2025-07-14T09:20:22","slug":"with-a-budget-of-aed-750-million-launch-of-a-major-project-to-develop-emirates-road","status":"publish","type":"post","link":"https:\/\/www.uaebarq.ae\/en\/2025\/07\/14\/with-a-budget-of-aed-750-million-launch-of-a-major-project-to-develop-emirates-road\/","title":{"rendered":"With a budget of AED 750 million.. Launch of a major project to develop Emirates Road"},"content":{"rendered":"\n<p>The Ministry of Energy and Infrastructure has announced a major project to enhance Emirates Road, with a budget of AED 750 million.<\/p>\n\n\n\n<p>Implementation is set to begin in September 2025.<\/p>\n\n\n\n<p>The project spans 25 kilometres, starting from Al Badee Interchange in Sharjah, and includes a 65% increase in the road&#8217;s capacity, accommodating up to 9,000 vehicles per hour.<\/p>\n\n\n\n<p>It involves enhancing the capacity of Intersection No. 7 by constructing six bridges with a total length of 12.6 kilometers, along with the construction of collector roads on both sides of the road with a total length of 3.4 kilometers.<\/p>\n\n\n\n<p>Additionally, new traffic lanes will be added, covering a total length of 70 kilometers.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Ministry of Energy and Infrastructure has announced a major project to enhance Emirates Road, with a budget of AED 750 million. Implementation is set to begin in September 2025. The project spans 25 kilometres, starting from Al Badee Interchange in Sharjah, and includes a 65% increase in the road&#8217;s capacity, accommodating up to 9,000 &hellip;<\/p>\n","protected":false},"author":5,"featured_media":62988,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-62987","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-news"],"_links":{"self":[{"href":"https:\/\/www.uaebarq.ae\/en\/wp-json\/wp\/v2\/posts\/62987","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.uaebarq.ae\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.uaebarq.ae\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.uaebarq.ae\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.uaebarq.ae\/en\/wp-json\/wp\/v2\/comments?post=62987"}],"version-history":[{"count":1,"href":"https:\/\/www.uaebarq.ae\/en\/wp-json\/wp\/v2\/posts\/62987\/revisions"}],"predecessor-version":[{"id":62989,"href":"https:\/\/www.uaebarq.ae\/en\/wp-json\/wp\/v2\/posts\/62987\/revisions\/62989"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.uaebarq.ae\/en\/wp-json\/wp\/v2\/media\/62988"}],"wp:attachment":[{"href":"https:\/\/www.uaebarq.ae\/en\/wp-json\/wp\/v2\/media?parent=62987"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.uaebarq.ae\/en\/wp-json\/wp\/v2\/categories?post=62987"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.uaebarq.ae\/en\/wp-json\/wp\/v2\/tags?post=62987"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}