{"id":30216,"date":"2021-01-27T11:58:48","date_gmt":"2021-01-27T07:58:48","guid":{"rendered":"https:\/\/www.uaebarq.ae\/en\/?p=30216"},"modified":"2021-01-27T11:58:49","modified_gmt":"2021-01-27T07:58:49","slug":"sewa-executes-3-strategic-developmental-projects-of-water-transmission-lines","status":"publish","type":"post","link":"https:\/\/www.uaebarq.ae\/en\/2021\/01\/27\/sewa-executes-3-strategic-developmental-projects-of-water-transmission-lines\/","title":{"rendered":"SEWA executes 3 strategic developmental projects of water transmission lines"},"content":{"rendered":"\n<p>At a cost of AED 121,920 million\u2026 SEWA executes 3 strategic developmental projects of water transmission lines and increasing their capacity, including the extension of a water line from &#8220;Hamda&#8221; area to &#8220;Budaiya&#8221; area, and main water line from Al-Nahda to \u201cIndustrial Area 4\u201d, in addition to a water transmission line project from \u201cRahmaniyah 1\u201d to \u201cAzra\u201d. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>At a cost of AED 121,920 million\u2026 SEWA executes 3 strategic developmental projects of water transmission lines and increasing their capacity, including the extension of a water line from &#8220;Hamda&#8221; area to &#8220;Budaiya&#8221; area, and main water line from Al-Nahda to \u201cIndustrial Area 4\u201d, in addition to a water transmission line project from \u201cRahmaniyah 1\u201d &hellip;<\/p>\n","protected":false},"author":2,"featured_media":30217,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-30216","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-news"],"_links":{"self":[{"href":"https:\/\/www.uaebarq.ae\/en\/wp-json\/wp\/v2\/posts\/30216","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.uaebarq.ae\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.uaebarq.ae\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.uaebarq.ae\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.uaebarq.ae\/en\/wp-json\/wp\/v2\/comments?post=30216"}],"version-history":[{"count":1,"href":"https:\/\/www.uaebarq.ae\/en\/wp-json\/wp\/v2\/posts\/30216\/revisions"}],"predecessor-version":[{"id":30218,"href":"https:\/\/www.uaebarq.ae\/en\/wp-json\/wp\/v2\/posts\/30216\/revisions\/30218"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.uaebarq.ae\/en\/wp-json\/wp\/v2\/media\/30217"}],"wp:attachment":[{"href":"https:\/\/www.uaebarq.ae\/en\/wp-json\/wp\/v2\/media?parent=30216"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.uaebarq.ae\/en\/wp-json\/wp\/v2\/categories?post=30216"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.uaebarq.ae\/en\/wp-json\/wp\/v2\/tags?post=30216"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}